| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Stream Restoration (rehabilitation of Kings Branch and riparian corridor) | 4500 | linear feet | $300.00 | $1,350,000.00 | Construction |
| Stream Grading | 4500 | linear feet | $100.00 | $450,000.00 | Construction |
| Rock Habitat and Stabilization Structures Installation | 1 | lot | $250,000.00 | $250,000.00 | Construction |
| Wood Habitat and Stabilization Structures Installation | 1 | lot | $200,000.00 | $200,000.00 | Construction |
| Erosion Control Measures | 4500 | linear feet | $50.00 | $225,000.00 | Construction |
| Riparian Vegetation Installation | 4500 | linear feet | $75.00 | $337,500.00 | Construction |
| Sanitary Sewer Relocation | 215 | linear feet | $500.00 | $107,500.00 | Construction |
| Aerial Sewer Stream Crossing Replacement | 2 | each | $140,000.00 | $280,000.00 | Construction |
| Estimated Bid Value | $3,200,000.00 | ||||
Sign up free to see the agency name and the original bid posting link, plus the 1 document, contracting-officer contacts and AI response outlines. Every feature is free through December 31, 2026.