| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Class E Rip Rap | 950 | Ton | $70.00 | $66,500.00 | Construction |
| Removals (associated with creek repair) | 1 | Lot | $10,000.00 | $10,000.00 | Construction |
| Grading (associated with creek repair) | 1 | Lot | $15,000.00 | $15,000.00 | Construction |
| Restoration (site restoration after construction) | 1 | Lot | $12,000.00 | $12,000.00 | Construction |
| Traffic Control (during construction) | 1 | Lot | $8,000.00 | $8,000.00 | Construction |
| Erosion Control (during and after construction) | 1 | Lot | $10,000.00 | $10,000.00 | Construction |
| Survey (pre-construction and post-construction) | 1 | Lot | $8,500.00 | $8,500.00 | Professional Services |
| Estimated Bid Value | $140,000.00 | ||||
Sign up free to see the agency name and the original bid posting link. Pro adds contracting-officer contacts and AI response outlines.
Sign Up Free → Already have an account? Log in