The Massachusetts Department of Transportation is seeking proposals for the Design-Build replacement of the Bourne Bridge and Sagamore Bridge over the Cape Cod Canal. This project also includes the replacement of Route 3 over US 6. Interested parties must submit a Letter of Interest by May 27, 2026, to be considered for the Request for Qualifications package.
Line Items
Item
Qty
Unit
Est. Unit Price
Est. Total
Category
BOURNE Bridge Replacement, B-17-005, (ARF) (SAGAMORE BRIDGE), US 6 over the Cape Cod Canal, Sandwich Road (Route 6A) and MCR/MBTA Railroad, Includes Replacement of B-17-027 Route 3 over US 6 (Cape Cod Bridges Program Phase I) DESIGN-BUILD
1
EA - Each
$1,603,900,000.00
$1,603,900,000.00
Construction
Estimated Bid Value
$1,603,900,000.00
Want the full details?
Sign up free to see the agency name and the original bid posting link. Pro adds the 14 documents, contracting-officer contacts and AI response outlines.