Building 510 Substation Upgrade - Phase I

Estimated Value: $1,500,000
Closing Soon 2 days left New YorkConstructionrfi
Oct 12, 2026
Oct 23, 2026 8:00 PM
Construction
rfi
238210
AI Summary
The Department of Energy is seeking interested contractors for the Building 510 Substation Upgrade - Phase I project at Brookhaven National Laboratory. This project involves the removal and replacement of existing medium voltage substation equipment, including transformers and switchgear, with new exterior substation infrastructure. Switchgear and transformers will be provided as Government Furnished Equipment (GFE). Interested parties should submit a statement of interest and capabilities statement via email.
Line Items
ItemQtyUnitEst. Unit PriceEst. TotalCategory
Labor, supervision, equipment, and services for complete removal and upgrading of existing Building 510 electrical substation equipment 1 lot $250,000.00 $250,000.00 Construction
Removal of two medium voltage substation transformers (existing) 2 each $15,000.00 $30,000.00 Construction
Removal of one medium voltage oil switch (existing) 1 each $10,000.00 $10,000.00 Construction
Removal of medium voltage distribution cabling (existing) 1 lot $20,000.00 $20,000.00 Construction
Installation of new exterior substation infrastructure (site work, grading, drainage) 1 lot $100,000.00 $100,000.00 Construction
Construction of new transformer pads (for two GFE transformers) 2 each $25,000.00 $50,000.00 Construction
Construction of new switchgear pad (for one GFE pad mounted medium voltage switchgear) 1 each $30,000.00 $30,000.00 Construction
Installation of two new medium voltage transformers (GFE) 2 each $40,000.00 $80,000.00 Construction
Installation of one pad mounted medium voltage switchgear (GFE) 1 each $35,000.00 $35,000.00 Construction
Installation of medium voltage feeders in a new concrete encased duct bank 1 lot $200,000.00 $200,000.00 Construction
Installation of grounding system for new substation 1 lot $25,000.00 $25,000.00 Construction
Installation of crushed stone for new substation 1 lot $15,000.00 $15,000.00 Construction
Phased cutovers and commissioning to minimize electric service disruptions 1 lot $150,000.00 $150,000.00 Construction
Provisions for future redundant circuit configuration 1 lot $75,000.00 $75,000.00 Construction
Removal of old transformers and oil switch from equipment vault in Building 510 basement (post-cutover) 1 lot $20,000.00 $20,000.00 Construction
Project Management, Engineering, and Coordination 1 lot $400,000.00 $400,000.00 Professional Services
Estimated Bid Value$1,500,000.00

Want the full details?

Sign up free to see the agency name and the original bid posting link, plus contracting-officer contacts and AI response outlines. Every feature is free through December 31, 2026.

Sign Up Free → Already have an account? Log in

Browse More Bids

Bids in New YorkConstruction BidsRFI BidsClosing Soon All Bids