| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Construction and possible maintenance of a saltwater barrier sill (between Mile 63.0 and Mile 64.0 AHP on the Mississippi River) | 1 | lot | $17,500,000.00 | $17,500,000.00 | Construction |
| Hydraulically dredging material from river bottom borrow area | 1 | lot | — | — | Construction |
| Placement of hydraulically dredged material for sill construction | 1 | lot | — | — | Construction |
| Cutterhead dredge and attendant plant (contractor-provided) | 1 | lot | — | — | Construction |
| Estimated Bid Value | $17,500,000.00 | ||||