| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Stream Restoration (natural channel design and riparian corridor enhancements) | 5916 | linear feet | $250.00 | $1,479,000.00 | Construction |
| Invasive Plant Removal | 1 | lot | $50,000.00 | $50,000.00 | Construction |
| Native Tree, Shrub, and Herbaceous Vegetation Installation | 1 | lot | $75,000.00 | $75,000.00 | Construction |
| Sanitary Sewer Force Main Bypass Pumping System (up to 2,600 GPM) | 1 | lot | $300,000.00 | $300,000.00 | Construction |
| Continuous 24-hour Operation and Maintenance for Bypass System | 1 | lot | $100,000.00 | $100,000.00 | Construction |
| Pre-construction CCTV Inspection of Sanitary Sewer Force Main | 1 | lot | $23,000.00 | $23,000.00 | Professional Services |
| Post-construction CCTV Inspection of Sanitary Sewer Force Main | 1 | lot | $23,000.00 | $23,000.00 | Professional Services |
| Estimated Bid Value | $2,050,000.00 | ||||
Sign up free to see the agency name and the original bid posting link, plus contracting-officer contacts and AI response outlines. Every feature is free through December 31, 2026.
Sign Up Free → Already have an account? Log in