| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Demolition of existing bridge superstructure | 1 | lot | $250,000.00 | $250,000.00 | Construction |
| Substructure repair (existing bridge) | 1 | lot | $300,000.00 | $300,000.00 | Construction |
| Reconstruction of superstructure with prestressed Bulb Tee's | 1 | lot | $1,800,000.00 | $1,800,000.00 | Construction |
| Approach work (roadway, grading, paving, etc.) | 1 | lot | $600,000.00 | $600,000.00 | Construction |
| Water line replacement | 1 | lot | $300,000.00 | $300,000.00 | Construction |
| Estimated Bid Value | $3,250,000.00 | ||||