| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Maintenance of Traffic | 1 | lot | $25,000.00 | $25,000.00 | Construction |
| Erosion and Turbidity Control | 1 | lot | $50,000.00 | $50,000.00 | Construction |
| Site Access and Staging | 1 | lot | $30,000.00 | $30,000.00 | Construction |
| Survey Control | 1 | lot | $15,000.00 | $15,000.00 | Professional Services |
| Debris Removal | 1 | lot | $40,000.00 | $40,000.00 | Construction |
| Steel Sheet Pile Installation | 1 | lot | $500,000.00 | $500,000.00 | Construction |
| Void Filling beneath Existing Downstream Apron | 1 | lot | $200,000.00 | $200,000.00 | Construction |
| Riprap Installation | 1 | lot | $300,000.00 | $300,000.00 | Construction |
| Bank and Canal Slope Stabilization | 1 | lot | $250,000.00 | $250,000.00 | Construction |
| Site Restoration | 1 | lot | $50,000.00 | $50,000.00 | Construction |
| As-Built Documentation | 1 | lot | $10,000.00 | $10,000.00 | Professional Services |
| Labor (all trades) | 1 | lot | — | — | Construction |
| Materials (all types) | 1 | lot | — | — | Construction |
| Equipment (all types) | 1 | lot | — | — | Construction |
| Supervision | 1 | lot | — | — | Professional Services |
| Surveying | 1 | lot | — | — | Professional Services |
| Diving Support | 1 | lot | — | — | Professional Services |
| Temporary Controls | 1 | lot | — | — | Construction |
| Permits | 1 | lot | — | — | Professional Services |
| Disposal | 1 | lot | — | — | Construction |
| Testing | 1 | lot | — | — | Professional Services |
| Incidentals | 1 | lot | — | — | Other |
| Estimated Bid Value | $1,500,000.00 | ||||
Sign up free to see the agency name and the original bid posting link. Pro adds the 1 document, contracting-officer contacts and AI response outlines.