| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Maintenance of Traffic/Temporary Traffic Control/Lane Closures | 1 | lot | $300,000.00 | $300,000.00 | Construction |
| Erosion & Sedimentation Control | 1 | lot | $50,000.00 | $50,000.00 | Construction |
| Existing Paver and Concrete Header Curb Demolition | 1 | lot | $100,000.00 | $100,000.00 | Construction |
| Milling (1.5" to 5" depth) for Bonnet Creek Parkway and adjoining roadways | 1 | lot | $750,000.00 | $750,000.00 | Construction |
| Milling (1.5" to 5" depth) for Hotel Plaza Blvd. | 1 | lot | $500,000.00 | $500,000.00 | Construction |
| Resurfacing with SP Structural (Traffic E) (PG 82-22) (1.5" to 3.5" depth) for Bonnet Creek Parkway and adjoining roadways | 1 | lot | $1,000,000.00 | $1,000,000.00 | Construction |
| Resurfacing with SP Structural (Traffic E) (PG 82-22) (1.5" to 3.5" depth) for Hotel Plaza Blvd. | 1 | lot | $700,000.00 | $700,000.00 | Construction |
| Resurfacing with Friction Course FC-12.5 (Traffic E) (PG 82-22) (1.5" depth) for Bonnet Creek Parkway and adjoining roadways | 1 | lot | $400,000.00 | $400,000.00 | Construction |
| Resurfacing with Friction Course FC-12.5 (Traffic E) (PG 82-22) (1.5" depth) for Hotel Plaza Blvd. | 1 | lot | $250,000.00 | $250,000.00 | Construction |
| Signage & Pavement Markings | 1 | lot | $150,000.00 | $150,000.00 | Construction |
| Patterned Pavement Installation (final colored asphalt) for Hotel Plaza Blvd. crosswalks | 1 | lot | $300,000.00 | $300,000.00 | Construction |
| Estimated Bid Value | $4,500,000.00 | ||||