This bid is for minor construction work involving the removal of an existing well pump and the installation of a new submersible pump assembly, including a new VFD, drop pipe, and associated startup and testing services, for the St George Water Department.
Line Items
ItemQtyUnitEst. Unit PriceEst. TotalCategory
Removal of existing well pump 1 lot $1,500.00 $1,500.00 Construction
Grundfos 385S400-6B-6, 8-inch, six-stage pump end 1 each $6,000.00 $6,000.00 Construction
40 HP SME, 230-volt, three-phase submersible motor 1 each $4,500.00 $4,500.00 Construction
4-inch Schedule 40 galvanized threaded-and-coupled drop pipe 150 feet $25.00 $3,750.00 Construction
Grundfos CUE VFD (Variable Frequency Drive) 1 each $5,000.00 $5,000.00 Construction
Installation and setting of new submersible assembly 1 lot $4,000.00 $4,000.00 Construction
Connection to existing discharge piping and VFD 1 lot $2,000.00 $2,000.00 Construction
Startup and operational testing of new assembly 1 lot $3,250.00 $3,250.00 Construction
Estimated Bid Value$30,000.00

Want the full details?

Sign up free to see the agency name and the original bid posting link. Pro adds contracting-officer contacts and AI response outlines.

Sign Up Free → Already have an account? Log in

Browse More Bids

Bids in South CarolinaComputer Hardware BidsSOLICITATION BidsClosing Soon All Bids