Concession Stand

Estimated Value: $325,000
Closing Soon 1 day left GeorgiaConstructionsolicitation
Sep 16, 2026
Oct 19, 2026 3:00 PM
Construction
solicitation
236220
AI Summary
This bid is for the turnkey construction of a 20' x 30' concession/restroom facility, including all site work, utilities, and a lift station, at the Wilcox County Schools tennis courts.
Line Items
ItemQtyUnitEst. Unit PriceEst. TotalCategory
Turnkey Construction of 20' x 30' Concession/Restroom Facility 1 lot $250,000.00 $250,000.00 Construction
Gable-style metal roof 1 each $15,000.00 $15,000.00 Construction
Decorative block/masonry (matching existing structures) 1 lot $20,000.00 $20,000.00 Construction
13' x 9' storage/electrical room construction 1 each $5,000.00 $5,000.00 Construction
Exterior metal door for storage/electrical room 1 each $1,000.00 $1,000.00 Construction
17' x 10' concession area construction 1 each $7,000.00 $7,000.00 Construction
Exterior metal door for concession area 1 each $1,000.00 $1,000.00 Construction
8' roll-up service door for concession area 1 each $2,500.00 $2,500.00 Construction
Serving counter for concession area 1 each $1,500.00 $1,500.00 Construction
Sink for concession area 1 each $500.00 $500.00 Construction
Hot water heater 1 each $800.00 $800.00 Construction
Men's restroom construction 1 each $6,000.00 $6,000.00 Construction
Exterior metal door for men's restroom 1 each $1,000.00 $1,000.00 Construction
ADA-accessible stall with toilet (men's restroom) 1 each $1,500.00 $1,500.00 Construction
Urinal (men's restroom) 1 each $700.00 $700.00 Construction
Sink (men's restroom) 1 each $500.00 $500.00 Construction
Women's restroom construction 1 each $8,000.00 $8,000.00 Construction
Exterior metal door for women's restroom 1 each $1,000.00 $1,000.00 Construction
ADA-accessible stall with toilet (women's restroom) 1 each $1,500.00 $1,500.00 Construction
Standard stalls with toilets (women's restroom) 2 each $1,000.00 $2,000.00 Construction
Sink (women's restroom) 1 each $500.00 $500.00 Construction
Site work (excavation, grading, etc.) 1 lot $10,000.00 $10,000.00 Construction
Foundation/slab 1 lot $8,000.00 $8,000.00 Construction
Flooring (durable, moisture- and slip-resistant in concession/restrooms) 1 lot $6,000.00 $6,000.00 Construction
Interior and exterior painting/finishes 1 lot $5,000.00 $5,000.00 Construction
Plumbing (all fixtures, piping, hot water heater installation) 1 lot $12,000.00 $12,000.00 Construction
Electrical service, wiring, receptacles, interior/exterior lighting 1 lot $10,000.00 $10,000.00 Construction
Ventilation system 1 lot $2,000.00 $2,000.00 Construction
Doors and hardware (all specified doors) 1 lot $3,000.00 $3,000.00 Construction
Complete lift station (pumps, controls, alarm, electrical, piping, excavation, connection) 1 each $30,000.00 $30,000.00 Construction
Permits and inspections 1 lot $2,000.00 $2,000.00 Professional Services
Estimated Bid Value$325,000.00

Want the full details?

Sign up free to see the agency name and the original bid posting link. Pro adds the 1 document, contracting-officer contacts and AI response outlines.

📎 PE-55761-NONST-2027-000000006-2026-09-16_15_10_39-ba6fc3e9-7e65-47b3-99bb-d69e3eb52d17.docx View
Sign Up Free → Already have an account? Log in

Browse More Bids

Bids in GeorgiaConstruction BidsSOLICITATION BidsClosing Soon All Bids