| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Road Patching (as directed by Engineer) | 1 | lot | $50,000.00 | $50,000.00 | Construction |
| Road Widening (milling minimum 9" into existing edge of asphalt) | 1 | linear mile | $150,000.00 | $150,000.00 | Construction |
| Leveling with 100 lbs/sy of OGI (Open Graded Interlayer) | 1 | square yard | $5.00 | $500,000.00 | Construction |
| Asphalt Overlay (165 lbs/sy of 12.5 mm asphalt) | 1 | square yard | $8.00 | $800,000.00 | Construction |
| Thermoplastic Traffic Striping | 1 | linear mile | $10,000.00 | $10,000.00 | Construction |
| Rumble Strips | 1 | linear mile | $5,000.00 | $5,000.00 | Construction |
| Stop Bars | 1 | each | $500.00 | $500.00 | Construction |
| Shoulder Grading | 1 | linear mile | $10,000.00 | $10,000.00 | Construction |
| Miscellaneous Items Pertaining to Project | 1 | lot | $25,000.00 | $25,000.00 | Construction |
| Estimated Bid Value | $1,200,000.00 | ||||
Sign up free to see the agency name and the original bid posting link. Pro adds the 1 document, contracting-officer contacts and AI response outlines.