| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| PVC water line (12" to 20") by excavation | 24693 | linear feet | $60.00 | $1,481,580.00 | Construction |
| Fusible PVC water line (12" to 20") by directional bore | 7400 | linear feet | $120.00 | $888,000.00 | Construction |
| Push-on or restrained joint ductile iron water line (12" to 20") | 2162 | linear feet | $100.00 | $216,200.00 | Construction |
| Steel casing (24" to 36") by jack and bore | 1436 | linear feet | $300.00 | $430,800.00 | Construction |
| Fire hydrants complete | 28 | each | $5,000.00 | $140,000.00 | Construction |
| Resilient seated gate valves and valve boxes (8" to 20") | 22 | each | $3,000.00 | $66,000.00 | Construction |
| Pavement removal and replacement | 1 | lot | $1,500,000.00 | $1,500,000.00 | Construction |
| Soil erosion and sediment control best management practices | 1 | lot | $500,000.00 | $500,000.00 | Construction |
| Storm water monitoring | 1 | lot | $250,000.00 | $250,000.00 | Professional Services |
| Appurtenances (fittings, connections, etc.) | 1 | lot | $1,500,000.00 | $1,500,000.00 | Construction |
| Offerors' Conference Attendance | 1 | event | — | — | Professional Services |
| Estimated Bid Value | $7,000,000.00 | ||||
Sign up free to see the agency name and the original bid posting link. Pro adds the 1 document, contracting-officer contacts and AI response outlines.