| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| 75Hp Backwash Pump (new, for redundancy) | 1 | each | $35,000.00 | $35,000.00 | Facilities |
| Concrete pad for pump and motor (with anchoring/dowelling) | 1 | lot | $10,000.00 | $10,000.00 | Construction |
| Associated piping, fittings, and valves (provision, install, coordination) | 1 | lot | $20,000.00 | $20,000.00 | Construction |
| Check valve on existing backwash line (addition) | 1 | each | $2,500.00 | $2,500.00 | Facilities |
| Electrical wiring from motor to control panel (using existing conduit) | 1 | lot | $7,500.00 | $7,500.00 | Construction |
| System startup and testing after installation | 1 | lot | $5,000.00 | $5,000.00 | Professional Services |
| Training for system use | 1 | lot | $2,500.00 | $2,500.00 | Professional Services |
| Miscellaneous material, labor, tools, equipment for complete system | 1 | lot | $15,000.00 | $15,000.00 | Other |
| Project Management and Coordination | 1 | lot | $15,000.00 | $15,000.00 | Professional Services |
| Allowance Item (for SCADA system integration, coordinated by Owner) | 1 | lot | $12,500.00 | $12,500.00 | Other |
| Estimated Bid Value | $125,000.00 | ||||
Sign up free to see the agency name and the original bid posting link. Pro adds the 1 document, contracting-officer contacts and AI response outlines.