| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Stormwater Culvert Installation/Replacement/Repair (various sizes) | 1 | lot | $250,000.00 | $250,000.00 | Construction |
| Stormwater Pipe Installation/Replacement/Repair (various sizes) | 1 | lot | $250,000.00 | $250,000.00 | Construction |
| Stormwater Appurtenance Installation/Replacement/Repair (e.g., catch basins, manholes, headwalls) | 1 | lot | $150,000.00 | $150,000.00 | Construction |
| Qualified Labor for Stormwater Infrastructure Work | 1 | year | $50,000.00 | $50,000.00 | Construction |
| Equipment Rental/Use for Stormwater Infrastructure Work | 1 | year | $50,000.00 | $50,000.00 | Construction |
| Estimated Bid Value | $750,000.00 | ||||
Sign up free to see the agency name and the original bid posting link. Pro adds the 1 document, contracting-officer contacts and AI response outlines.