| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Construction of new underground PRV and FM vault (precast concrete, access hatches, internal ladder) | 1 | lot | $150,000.00 | $150,000.00 | Construction |
| Installation of new finished water piping and sample line (within and outside vault, fittings, restraints, connections) | 1 | lot | $75,000.00 | $75,000.00 | Construction |
| Furnishing and installation of Pressure Reducing Valve (PRV) | 1 | each | $30,000.00 | $30,000.00 | Construction |
| Furnishing and installation of Flow Meter (FM) assembly | 1 | each | $25,000.00 | $25,000.00 | Construction |
| Furnishing and installation of isolation and bypass valves | 1 | lot | $20,000.00 | $20,000.00 | Construction |
| Furnishing and installation of associated mechanical appurtenances (e.g., gauges, drains) | 1 | lot | $15,000.00 | $15,000.00 | Construction |
| Provision and installation of electrical power, grounding, conduits, and wiring | 1 | lot | $40,000.00 | $40,000.00 | Construction |
| Provision and installation of instrumentation for flow and pressure monitoring | 1 | lot | $35,000.00 | $35,000.00 | Construction |
| Integration with existing control system (wiring and programming) | 1 | lot | $10,000.00 | $10,000.00 | IT Services |
| Site work, excavation, backfill, and restoration | 1 | lot | $50,000.00 | $50,000.00 | Construction |
| Estimated Bid Value | $450,000.00 | ||||