| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| 1000 HP Reservoir Vertical Turbine Motor | 2 | each | $350,000.00 | $700,000.00 | Construction |
| Installation of 1000 HP Vertical Turbine Motors (including laser-alignment) | 2 | each | $75,000.00 | $150,000.00 | Construction |
| Crane Services for Motor Installation/Removal | 1 | lot | $20,000.00 | $20,000.00 | Construction |
| Pump House Roof Removal and Replacement | 1 | lot | $30,000.00 | $30,000.00 | Construction |
| Existing Motor Removal and Transport to On-Site Storage | 2 | each | $10,000.00 | $20,000.00 | Construction |
| Provisions for Vibration Detectors (tapped holes) | 4 | each | $500.00 | $2,000.00 | Construction |
| New Coupling for Vertical Turbine Unit (with laser alignment) | 2 | each | $15,000.00 | $30,000.00 | Construction |
| Electrical Disconnections and Reconnections | 2 | each | $10,000.00 | $20,000.00 | Construction |
| Vibration System Installation and Operation Assurance | 2 | each | $25,000.00 | $50,000.00 | Construction |
| Vibration Analysis (before and after new motor installation) | 1 | lot | $15,000.00 | $15,000.00 | Professional Services |
| Project Management and Incidentals | 1 | lot | $143,000.00 | $143,000.00 | Professional Services |
| Estimated Bid Value | $1,200,000.00 | ||||
Sign up free to see the agency name and the original bid posting link. Pro adds the 1 document, contracting-officer contacts and AI response outlines.