| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Streambank stabilization project (overall management and execution) | 1 | lot | $1,500,000.00 | $1,500,000.00 | Construction |
| Sheet pile retaining wall construction | 450 | linear feet | $500.00 | $225,000.00 | Construction |
| Modification of existing storm drain outfall | 1 | each | $75,000.00 | $75,000.00 | Construction |
| Guardrail installation | 1 | lot | $50,000.00 | $50,000.00 | Construction |
| Riprap installation (initial project reach) | 1 | lot | $100,000.00 | $100,000.00 | Construction |
| Geotextile fabric installation (initial project reach) | 1 | lot | $50,000.00 | $50,000.00 | Construction |
| Native vegetation planting (initial project reach) | 1 | lot | $75,000.00 | $75,000.00 | Construction |
| Grading (initial project reach) | 1 | lot | $100,000.00 | $100,000.00 | Construction |
| Associated appurtenances (initial project reach) | 1 | lot | $50,000.00 | $50,000.00 | Construction |
| Localized streambank stabilization improvements (spot treatments) | 1 | lot | $500,000.00 | $500,000.00 | Construction |
| Riprap (spot treatments) | 1 | lot | $150,000.00 | $150,000.00 | Construction |
| Geotextile fabric (spot treatments) | 1 | lot | $75,000.00 | $75,000.00 | Construction |
| Native vegetation (spot treatments) | 1 | lot | $100,000.00 | $100,000.00 | Construction |
| Associated erosion control measures (spot treatments) | 1 | lot | $75,000.00 | $75,000.00 | Construction |
| Environmental consulting and permitting (FFRMS, floodplain evaluation, etc.) | 1 | lot | $200,000.00 | $200,000.00 | Professional Services |
| Engineering design and oversight | 1 | lot | $250,000.00 | $250,000.00 | Professional Services |
| Estimated Bid Value | $3,500,000.00 | ||||
Sign up free to see the agency name and the original bid posting link. Pro adds contracting-officer contacts and AI response outlines.
Sign Up Free → Already have an account? Log in