| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Demolition and Removal Services (existing restroom fixtures, finishes, walls) | 1 | lot | $20,000.00 | $20,000.00 | Construction |
| Rough Carpentry (framing, blocking) | 1 | lot | $8,000.00 | $8,000.00 | Construction |
| Plumbing Fixtures (toilets, urinals, sinks, faucets, flush valves, grab bars) | 1 | lot | $35,000.00 | $35,000.00 | Construction |
| Plumbing Installation Services (new piping, drains, water lines, fixture installation) | 1 | lot | $40,000.00 | $40,000.00 | Construction |
| Electrical Services (lighting, outlets, wiring, exhaust fans) | 1 | lot | $25,000.00 | $25,000.00 | Construction |
| HVAC Services (ventilation, exhaust fan installation/replacement) | 1 | lot | $15,000.00 | $15,000.00 | Construction |
| Flooring Installation (tile, grout, waterproofing) | 1 | lot | $18,000.00 | $18,000.00 | Construction |
| Wall Finishes (tile, paint, wall protection panels) | 1 | lot | $17,000.00 | $17,000.00 | Construction |
| Ceiling Installation (acoustic ceiling tiles, grid system) | 1 | lot | $10,000.00 | $10,000.00 | Construction |
| Restroom Partitions (stalls, hardware) | 1 | lot | $12,000.00 | $12,000.00 | Construction |
| Countertops and Vanity Cabinets | 1 | lot | $9,000.00 | $9,000.00 | Construction |
| Mirrors | 1 | lot | $2,000.00 | $2,000.00 | Construction |
| Accessories (paper towel dispensers, soap dispensers, waste receptacles, baby changing stations) | 1 | lot | $5,000.00 | $5,000.00 | Construction |
| Doors and Hardware (new doors, frames, hinges, locks) | 1 | lot | $7,000.00 | $7,000.00 | Construction |
| General Contractor Services (project management, supervision, coordination) | 1 | lot | $25,000.00 | $25,000.00 | Professional Services |
| Estimated Bid Value | $250,000.00 | ||||
Sign up free to see the agency name and the original bid posting link. Pro adds the 1 document, contracting-officer contacts and AI response outlines.