| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Removal of existing stair assembly | 2 | each | $1,500.00 | $3,000.00 | Construction |
| Galvanized Steel Stair Assembly (including materials and fabrication) | 2 | each | $8,000.00 | $16,000.00 | Construction |
| Installation of Galvanized Steel Stair Assembly | 2 | each | $2,000.00 | $4,000.00 | Construction |
| Site Preparation and Cleanup | 1 | lot | $2,000.00 | $2,000.00 | Construction |
| Estimated Bid Value | $25,000.00 | ||||
Sign up free to see the agency name and the original bid posting link. Pro adds contracting-officer contacts and AI response outlines.
Sign Up Free → Already have an account? Log in