| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Pedestrian Bridge Construction (T-57 SR169) | 1 | lot | $3,000,000.00 | $3,000,000.00 | Construction |
| Site Preparation and Earthwork | 1 | lot | $150,000.00 | $150,000.00 | Construction |
| Foundation Construction (Piles/Footings) | 1 | lot | $100,000.00 | $100,000.00 | Construction |
| Bridge Abutments and Piers | 1 | lot | $75,000.00 | $75,000.00 | Construction |
| Bridge Decking and Railings | 1 | lot | $75,000.00 | $75,000.00 | Construction |
| Approach Ramps/Walkways | 1 | lot | $50,000.00 | $50,000.00 | Construction |
| Drainage Systems | 1 | lot | $25,000.00 | $25,000.00 | Construction |
| Lighting and Electrical Systems | 1 | lot | $25,000.00 | $25,000.00 | Construction |
| Estimated Bid Value | $3,500,000.00 | ||||
Sign up free to see the agency name and the original bid posting link. Pro adds the 4 documents, contracting-officer contacts and AI response outlines.