| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Design-Build Construction Services for Building 1 Stabilization and Make Safe Preparation | 1 | lot | $15,000,000.00 | $15,000,000.00 | Construction |
| Building 1 Exterior Repair, Restoration, and Replacement of Deteriorated Building Envelope Components | 1 | lot | $3,000,000.00 | $3,000,000.00 | Construction |
| Building 1 Restoration of Main Entry Walk and Stair | 1 | lot | $500,000.00 | $500,000.00 | Construction |
| Building 1 Demolition of Existing Temporary Tunnel | 1 | lot | $250,000.00 | $250,000.00 | Construction |
| Building 1 Interior Demolition to Structural Frame with Abatement | 1 | lot | $2,000,000.00 | $2,000,000.00 | Construction |
| Building 1 Removal of Existing Systems (except to maintain limited building function and campus continuity) | 1 | lot | $1,000,000.00 | $1,000,000.00 | Construction |
| Design-Build Construction Services for Renovation and Fit-out of Outpatient Pharmacy within Building 3 | 1 | lot | $10,000,000.00 | $10,000,000.00 | Construction |
| Building 3 Interior Demolition for Permanent Pharmacy | 1 | lot | $500,000.00 | $500,000.00 | Construction |
| Building 3 Build Out for Permanent Pharmacy (Architectural Finishes) | 1 | lot | $2,000,000.00 | $2,000,000.00 | Construction |
| Building 3 Fire Protection System Installation/Upgrade for Pharmacy | 1 | lot | $750,000.00 | $750,000.00 | Construction |
| Building 3 Plumbing System Installation/Upgrade for Pharmacy | 1 | lot | $750,000.00 | $750,000.00 | Construction |
| Building 3 HVAC System Installation/Upgrade for Pharmacy | 1 | lot | $1,500,000.00 | $1,500,000.00 | Construction |
| Building 3 Electrical System Installation/Upgrade for Pharmacy | 1 | lot | $1,500,000.00 | $1,500,000.00 | Construction |
| Building 3 Communications System Installation/Upgrade for Pharmacy | 1 | lot | $500,000.00 | $500,000.00 | Construction |
| Building 3 Infection Control Measures for Pharmacy Construction | 1 | lot | $250,000.00 | $250,000.00 | Construction |
| Building 3 Commissioning Services for Pharmacy Systems | 1 | lot | $250,000.00 | $250,000.00 | Professional Services |
| Building 3 Turnover Requirements and Documentation for Pharmacy | 1 | lot | $250,000.00 | $250,000.00 | Professional Services |
| Estimated Bid Value | $25,000,000.00 | ||||
Sign up free to see the agency name and the original bid posting link, plus contracting-officer contacts and AI response outlines. Every feature is free through December 31, 2026.
Sign Up Free → Already have an account? Log in