Industry Day Announcement - VACAN Phase III

Estimated Value: $25,000,000
Closing Soon 4 days left Constructionother
Oct 13, 2026
Oct 27, 2026 9:00 PM
Construction
other
236220
AI Summary
This bid is for a Design-Build construction project at the Canandaigua VA Medical Center, involving the stabilization and preparation of Building 1 and the renovation and fit-out of an outpatient pharmacy within Building 3.
Line Items
ItemQtyUnitEst. Unit PriceEst. TotalCategory
Design-Build Construction Services for Building 1 Stabilization and Make Safe Preparation 1 lot $15,000,000.00 $15,000,000.00 Construction
Building 1 Exterior Repair, Restoration, and Replacement of Deteriorated Building Envelope Components 1 lot $3,000,000.00 $3,000,000.00 Construction
Building 1 Restoration of Main Entry Walk and Stair 1 lot $500,000.00 $500,000.00 Construction
Building 1 Demolition of Existing Temporary Tunnel 1 lot $250,000.00 $250,000.00 Construction
Building 1 Interior Demolition to Structural Frame with Abatement 1 lot $2,000,000.00 $2,000,000.00 Construction
Building 1 Removal of Existing Systems (except to maintain limited building function and campus continuity) 1 lot $1,000,000.00 $1,000,000.00 Construction
Design-Build Construction Services for Renovation and Fit-out of Outpatient Pharmacy within Building 3 1 lot $10,000,000.00 $10,000,000.00 Construction
Building 3 Interior Demolition for Permanent Pharmacy 1 lot $500,000.00 $500,000.00 Construction
Building 3 Build Out for Permanent Pharmacy (Architectural Finishes) 1 lot $2,000,000.00 $2,000,000.00 Construction
Building 3 Fire Protection System Installation/Upgrade for Pharmacy 1 lot $750,000.00 $750,000.00 Construction
Building 3 Plumbing System Installation/Upgrade for Pharmacy 1 lot $750,000.00 $750,000.00 Construction
Building 3 HVAC System Installation/Upgrade for Pharmacy 1 lot $1,500,000.00 $1,500,000.00 Construction
Building 3 Electrical System Installation/Upgrade for Pharmacy 1 lot $1,500,000.00 $1,500,000.00 Construction
Building 3 Communications System Installation/Upgrade for Pharmacy 1 lot $500,000.00 $500,000.00 Construction
Building 3 Infection Control Measures for Pharmacy Construction 1 lot $250,000.00 $250,000.00 Construction
Building 3 Commissioning Services for Pharmacy Systems 1 lot $250,000.00 $250,000.00 Professional Services
Building 3 Turnover Requirements and Documentation for Pharmacy 1 lot $250,000.00 $250,000.00 Professional Services
Estimated Bid Value$25,000,000.00

Want the full details?

Sign up free to see the agency name and the original bid posting link, plus contracting-officer contacts and AI response outlines. Every feature is free through December 31, 2026.

Sign Up Free → Already have an account? Log in

Browse More Bids

Construction BidsClosing Soon All Bids