Large Meter Changeout

Estimated Value: $150,000
Closing Soon 4 days left North CarolinaHealthcarerfq
Oct 13, 2026
Oct 28, 2026 12:00 AM
Healthcare
rfq
AI Summary
The City of Winston-Salem is seeking a qualified contractor for a large meter changeout project. The contractor will be responsible for all aspects of the project, including labor, supervision, equipment, materials, and transportation, to remove existing meters.
Line Items
ItemQtyUnitEst. Unit PriceEst. TotalCategory
Project Management and Supervision for Large Meter Changeout 1 lot $25,000.00 $25,000.00 Professional Services
Labor for Large Meter Removal and Installation 500 hour $75.00 $37,500.00 Construction
Equipment and Tools for Meter Changeout 1 lot $15,000.00 $15,000.00 Construction
Materials for Large Meter Changeout (e.g., fittings, seals, wiring) 1 lot $20,000.00 $20,000.00 Construction
Transportation for Personnel, Equipment, and Materials 1 lot $7,500.00 $7,500.00 Transportation
Incidental Services for Meter Changeout (e.g., site prep, cleanup, disposal) 1 lot $10,000.00 $10,000.00 Facilities
New Large Meters (supply only, if included in contractor scope) 100 each $350.00 $35,000.00 Construction
Estimated Bid Value$150,000.00

Want the full details?

Sign up free to see the agency name and the original bid posting link, plus the 1 document, contracting-officer contacts and AI response outlines. Every feature is free through December 31, 2026.

📎 IFB_-_Large_Meter_Changeout_-_FB2787.pdf View
Sign Up Free → Already have an account? Log in

Browse More Bids

Bids in North CarolinaHealthcare BidsRFQ BidsClosing Soon All Bids