| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Solar Renewable Energy Generating Facility (Design, Engineering, Permitting) | 1 | lot | $500,000.00 | $500,000.00 | Energy |
| Solar Renewable Energy Generating Facility (Construction and Installation) | 1 | lot | $3,000,000.00 | $3,000,000.00 | Construction |
| Solar Panels (e.g., 500W panels) | 2000 | each | $250.00 | $500,000.00 | Energy |
| Inverters (e.g., 100kW central inverters) | 10 | each | $15,000.00 | $150,000.00 | Energy |
| Racking and Mounting Systems | 1 | lot | $100,000.00 | $100,000.00 | Construction |
| Electrical Infrastructure (Cabling, Transformers, Switchgear) | 1 | lot | $200,000.00 | $200,000.00 | Construction |
| Site Preparation and Earthwork | 1 | lot | $100,000.00 | $100,000.00 | Construction |
| Interconnection Services and Equipment | 1 | lot | $150,000.00 | $150,000.00 | Energy |
| Project Management and Consulting Services | 1 | lot | $100,000.00 | $100,000.00 | Professional Services |
| Operations and Maintenance Services (Annual) | 20 | year | $50,000.00 | $1,000,000.00 | Energy |
| Estimated Bid Value | $5,000,000.00 | ||||