| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Construction of a one-story Area Maintenance Support Activity (AMSA) / Vehicle Maintenance Shop (VMS) building | 13000 | gross square feet | $700.00 | $9,100,000.00 | Construction |
| Vehicle Maintenance Work bays (within AMSA/VMS building) | 1 | lot | $1,000,000.00 | $1,000,000.00 | Construction |
| Tool and Parts Storage areas (within AMSA/VMS building) | 1 | lot | $250,000.00 | $250,000.00 | Construction |
| Office Space (within AMSA/VMS building) | 1 | lot | $300,000.00 | $300,000.00 | Construction |
| Classroom/Break Area (within AMSA/VMS building) | 1 | lot | $200,000.00 | $200,000.00 | Construction |
| Commo/Elec Repair Shop (within AMSA/VMS building) | 1 | lot | $250,000.00 | $250,000.00 | Construction |
| Fluids Areas (Controlled Waste/Flammable Storage/Fluids Distribution) (within AMSA/VMS building) | 1 | lot | $400,000.00 | $400,000.00 | Construction |
| Building Support Functions (Toilet Rooms, Mechanical Room, Electrical Room, TR, EF, Janitors Closet, Lactation Room) (within AMSA/VMS building) | 1 | lot | $500,000.00 | $500,000.00 | Construction |
| SATS Canopy (detached from main AMSA building) | 1 | each | $500,000.00 | $500,000.00 | Construction |
| Covered Wash Rack (detached from main AMSA building) | 1 | each | $600,000.00 | $600,000.00 | Construction |
| Bi-Level loading Ramp | 1 | each | $150,000.00 | $150,000.00 | Construction |
| Water treatment facility | 1 | each | $300,000.00 | $300,000.00 | Construction |
| Fire pump and tank | 1 | each | $250,000.00 | $250,000.00 | Construction |
| Estimated Bid Value | $13,000,000.00 | ||||