| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Project Management and Engineering Design Services for Boiler Replacement | 1 | lot | $150,000.00 | $150,000.00 | Professional Services |
| Demolition and Removal of Existing Steam Heat Exchanger System | 1 | lot | $75,000.00 | $75,000.00 | Construction |
| Gas-Fired Hot Water Boilers (Commercial Grade) | 3 | each | $75,000.00 | $225,000.00 | Facilities |
| Piping and Fittings (Gas, Water, Condensate) | 1 | lot | $100,000.00 | $100,000.00 | Construction |
| Pumps (Circulation, Condensate Return) | 5 | each | $5,000.00 | $25,000.00 | Facilities |
| Expansion Tanks and Air Separators | 3 | each | $3,000.00 | $9,000.00 | Facilities |
| Control Systems (DDC/BMS integration, sensors, actuators) | 1 | lot | $80,000.00 | $80,000.00 | Facilities |
| Gas Line Installation and Upgrades | 1 | lot | $60,000.00 | $60,000.00 | Construction |
| Electrical Wiring and Panel Upgrades for Boiler System | 1 | lot | $50,000.00 | $50,000.00 | Construction |
| Insulation for Piping and Components | 1 | lot | $40,000.00 | $40,000.00 | Construction |
| Ventilation and Flue Gas Exhaust Systems | 1 | lot | $30,000.00 | $30,000.00 | Construction |
| Installation Labor for Boiler System | 1 | lot | $400,000.00 | $400,000.00 | Construction |
| Testing, Commissioning, and Training Services | 1 | lot | $50,000.00 | $50,000.00 | Professional Services |
| Permits, Inspections, and Project Closeout Documentation | 1 | lot | $30,000.00 | $30,000.00 | Professional Services |
| Contingency for Unforeseen Conditions | 1 | lot | $186,000.00 | $186,000.00 | Other |
| Estimated Bid Value | $1,500,000.00 | ||||
Sign up free to see the agency name and the original bid posting link. Pro adds the 35 documents, contracting-officer contacts and AI response outlines.