| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Structural steel work to floating dock | 1 | lot | $750,000.00 | $750,000.00 | Construction |
| Fabrication and installation of new aluminum walkway | 1 | each | $250,000.00 | $250,000.00 | Construction |
| Increased electrical power distribution capacity (design and installation) | 1 | lot | $600,000.00 | $600,000.00 | Construction |
| Installation of power conversion equipment for electric ferry charging | 1 | lot | $800,000.00 | $800,000.00 | Energy |
| Installation of dispensers for electric ferry charging | 1 | lot | $400,000.00 | $400,000.00 | Energy |
| Hydraulic mooring line tensioning system (supply and installation) | 1 | each | $400,000.00 | $400,000.00 | Construction |
| Estimated Bid Value | $3,200,000.00 | ||||
Sign up free to see the agency name and the original bid posting link, plus contracting-officer contacts and AI response outlines. Every feature is free through December 31, 2026.
Sign Up Free → Already have an account? Log in