| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Removal of existing guardrail | 1 | lot | $2,500.00 | $2,500.00 | Construction |
| Site preparation | 1 | lot | $5,000.00 | $5,000.00 | Construction |
| Installation of erosion controls | 1 | lot | $3,000.00 | $3,000.00 | Construction |
| Earthwork | 1 | lot | $20,000.00 | $20,000.00 | Construction |
| Installation of precast concrete DMH (Drainage Manhole) | 2 | each | $7,500.00 | $15,000.00 | Construction |
| Installation of 30" ADS drainpipe | 200 | linear foot | $75.00 | $15,000.00 | Construction |
| Fill material and placement | 1 | lot | $10,000.00 | $10,000.00 | Construction |
| Riprap installation | 1 | lot | $8,000.00 | $8,000.00 | Construction |
| Loaming and seeding all disturbed areas | 1 | lot | $7,000.00 | $7,000.00 | Construction |
| Potential add alternates (contingency) | 1 | lot | $62,500.00 | $62,500.00 | Construction |
| Estimated Bid Value | $150,000.00 | ||||
Sign up free to see the agency name and the original bid posting link. Pro adds contracting-officer contacts and AI response outlines.
Sign Up Free → Already have an account? Log in