E-Rate cabling, cabling maintenance, network switches, network switches maintenance — Armstrong Twp High Sch Dis 225

Estimated Value: $10,250
Open New 28 days left IllinoisTechnologyrfp
Oct 14, 2026
Nov 11, 2026 5:00 PM
Technology
rfp
238210
AI Summary
Armstrong Township High School District 225 is seeking bids for an E-Rate funded project to upgrade cabling. The project involves removing and replacing existing cable with a fiber optic connection between the High School and the AG Building, requiring approximately 250 lineal feet of fiber optic cable installation. Bidders will also supply pricing for maintenance of network switches, antennas, connectors, and racks.
Line Items
ItemQtyUnitEst. Unit PriceEst. TotalCategory
Fiber Optic Cabling (installation and materials) 250 Feet $15.00 $3,750.00 IT Services
Basic Maintenance of Cabling 250 Feet $1.00 $250.00 IT Services
Network Switches and Necessary Software and Licenses 2 Each $1,500.00 $3,000.00 IT Hardware
Basic Maintenance of Network Switches 2 Each $250.00 $500.00 IT Services
Antennas, Connectors, and Related Components (for fiber connection) 4 Each $300.00 $1,200.00 IT Hardware
Basic Maintenance of Antennas, Connectors, and Related Components 4 Each $50.00 $200.00 IT Services
Network Racks 2 Each $600.00 $1,200.00 IT Hardware
Basic Maintenance of Network Racks 2 Each $75.00 $150.00 IT Services
Estimated Bid Value$10,250.00

Want the full details?

Sign up free to see the agency name and the original bid posting link. Pro adds the 1 document, contracting-officer contacts and AI response outlines.

📎 E-Rate_cabling__cabling_maintenance__network_switches__network_switches_maintenance_____Armstrong_Twp_High_Sch_Dis_225.pdf View
Sign Up Free → Already have an account? Log in

Browse More Bids

Bids in IllinoisTechnology BidsRFP BidsClosing Soon All Bids