| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Architectural demolition, reconfiguration, expansion, and renovation of existing spaces | 1 | lot | $8,000,000.00 | $8,000,000.00 | Construction |
| Architectural construction of new finished spaces, doors, and flooring systems | 1 | lot | $7,000,000.00 | $7,000,000.00 | Construction |
| Structural alteration of existing structural components and construction of new structural equipment support | 1 | lot | $3,000,000.00 | $3,000,000.00 | Construction |
| Electrical upgrades (panels, normal/critical power distribution, bonding, UPS, lighting, new power outlets) | 1 | lot | $10,000,000.00 | $10,000,000.00 | Construction |
| Installation and programming of Building Automation System (BAS) equipment and interfaces | 1 | lot | $2,500,000.00 | $2,500,000.00 | Facilities |
| Upgrades to existing HVAC, reprogramming of existing controls, installation of new HVAC and new controls | 1 | lot | $9,000,000.00 | $9,000,000.00 | Facilities |
| Modification of existing plumbing and installation of new plumbing for mechanical systems and interior drainage | 1 | lot | $4,000,000.00 | $4,000,000.00 | Construction |
| Upgrades to data communication infrastructure (new data outlets, patch panels, seismic rated IT racks, cable management, re-cabling to CAT 6A) | 1 | lot | $12,000,000.00 | $12,000,000.00 | Telecommunications |
| Upgrade of fiber infrastructure backbone (campus-wide, in-building and between buildings), civil site construction and landscaping | 1 | lot | $8,000,000.00 | $8,000,000.00 | Telecommunications |
| Civil site work (concrete duct banks, pre-cast manholes, excavation/repair of building waterproofing, site restoration) | 1 | lot | $5,000,000.00 | $5,000,000.00 | Construction |
| Asbestos and lead-based paint abatement, including abatement plan preparation | 1 | lot | $2,000,000.00 | $2,000,000.00 | Construction |
| Radon mitigation system installation, including detailed working drawings | 1 | lot | $1,000,000.00 | $1,000,000.00 | Facilities |
| Fire Suppression Upgrades (new gaseous suppression systems, modification of existing fire sprinkler systems, new fire sprinkler system for MCR Building) | 1 | lot | $3,000,000.00 | $3,000,000.00 | Security |
| Fire Alarm Upgrades | 1 | lot | $2,000,000.00 | $2,000,000.00 | Security |
| Firestopping and fire caulking for all wall and floor penetrations | 1 | lot | $1,000,000.00 | $1,000,000.00 | Construction |
| Physical security upgrades (Physical Access Control, intrusion detection, security cameras) | 1 | lot | $2,500,000.00 | $2,500,000.00 | Security |
| Estimated Bid Value | $75,000,000.00 | ||||
Sign up free to see the agency name and the original bid posting link, plus the 1 document, contracting-officer contacts and AI response outlines. Every feature is free through December 31, 2026.