| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Removal of Pavement, Asphalt | 18500 | square yards | $5.00 | $92,500.00 | Construction |
| Roadway Excavation | 3370 | cubic yards | $50.00 | $168,500.00 | Construction |
| Roadway Aggregate, Method 2 | 2900 | ton | $40.00 | $116,000.00 | Construction |
| Asphalt Concrete pavement, Type 1 | 4200 | ton | $150.00 | $630,000.00 | Construction |
| Minor Concrete Pavement, Reinforced | 630 | square yard | $70.00 | $44,100.00 | Construction |
| Curb, Concrete, 16-Inch Depth (Slotted) | 1540 | linear feet | $35.00 | $53,900.00 | Construction |
| Sidewalk, Concrete | 5670 | square yards | $60.00 | $340,200.00 | Construction |
| Accessibility Ramps, Concrete | 34 | each | $2,000.00 | $68,000.00 | Construction |
| Roadway Widening (Full depth pavement on aggregate base course) | 1 | lot | $1,500,000.00 | $1,500,000.00 | Construction |
| Reconstruction of existing turnaround | 1 | lot | $500,000.00 | $500,000.00 | Construction |
| Guardrail installation | 1 | lot | $250,000.00 | $250,000.00 | Construction |
| Gutter installation | 1 | lot | $100,000.00 | $100,000.00 | Construction |
| Mini-roundabouts (2 units) | 2 | each | $300,000.00 | $600,000.00 | Construction |
| Striping | 1 | lot | $75,000.00 | $75,000.00 | Construction |
| Pedestrian crossings | 1 | lot | $150,000.00 | $150,000.00 | Construction |
| Minor utility adjustments and construction | 1 | lot | $750,000.00 | $750,000.00 | Construction |
| Project Management and Overhead | 1 | lot | $9,500,000.00 | $9,500,000.00 | Professional Services |
| Estimated Bid Value | $15,000,000.00 | ||||