| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Sliplining of existing 48-inch trunk sewer with 42-inch slipliner pipe (Base Work) | 2368 | linear feet | $750.00 | $1,776,000.00 | Construction |
| Sliplining of existing 48-inch trunk sewer with 42-inch slipliner pipe (Option Work) | 849 | linear feet | $750.00 | $636,750.00 | Construction |
| Specialized insertion pits construction (two pits) | 2 | each | $50,000.00 | $100,000.00 | Construction |
| Sewer cleaning | 3217 | linear feet | $25.00 | $80,425.00 | Construction |
| Sewer televising | 3217 | linear feet | $15.00 | $48,255.00 | Construction |
| Sewer proofing | 3217 | linear feet | $10.00 | $32,170.00 | Construction |
| Annulus grouting | 3217 | linear feet | $50.00 | $160,850.00 | Construction |
| Sewer lateral reinstatement | 1 | lot | $100,000.00 | $100,000.00 | Construction |
| Maintenance of traffic | 1 | lot | $50,000.00 | $50,000.00 | Construction |
| Temporary erosion and sediment control | 1 | lot | $15,000.00 | $15,000.00 | Construction |
| Safety operations (IAW USACE EM 385-1-1 standards) | 1 | lot | $100,000.00 | $100,000.00 | Professional Services |
| Estimated Bid Value | $3,000,000.00 | ||||
Sign up free to see the agency name and the original bid posting link. Pro adds the 4 documents, contracting-officer contacts and AI response outlines.