| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Beachfill placement dredging (Cape May to Lower Township) | 600000 | cubic yards | $20.00 | $12,000,000.00 | Construction |
| Optional additional beachfill placement (Cape May to Lower Township) | 100000 | cubic yards | $20.00 | $2,000,000.00 | Construction |
| Pre-placement condition surveys (Cape May to Lower Township) | 1 | lot | $500,000.00 | $500,000.00 | Professional Services |
| Hopper and pipeline/mechanical dredge(s) mobilization/demobilization (Cape May) | 1 | lot | $1,000,000.00 | $1,000,000.00 | Construction |
| Beachfill placement (Brigantine Inlet to Great Egg Harbor Inlet) | 1500000 | cubic yards | $25.00 | $37,500,000.00 | Construction |
| Optional additional beachfill placement (Brigantine Inlet to Great Egg Harbor Inlet) | 500000 | cubic yards | $25.00 | $12,500,000.00 | Construction |
| Construction/repair of pedestrian, vehicle, and ADA compliant dune crossovers (Absecon Island) | 1 | lot | $2,000,000.00 | $2,000,000.00 | Construction |
| Dune grass planting (Absecon Island) | 1 | lot | $1,000,000.00 | $1,000,000.00 | Construction |
| Sand fencing installation (Absecon Island) | 1 | lot | $500,000.00 | $500,000.00 | Construction |
| Repair/extension of existing storm water outfalls and drainage structures (Absecon Island) | 1 | lot | $1,500,000.00 | $1,500,000.00 | Construction |
| Relocation/removal of existing structures or fill (Absecon Island) | 1 | lot | $1,000,000.00 | $1,000,000.00 | Construction |
| Beachfill placement (Barnegat Inlet to Little Egg Inlet) | 2000000 | cubic yards | $25.00 | $50,000,000.00 | Construction |
| Optional additional beachfill placement (Barnegat Inlet to Little Egg Inlet) | 500000 | cubic yards | $25.00 | $12,500,000.00 | Construction |
| Estimated Bid Value | $130,000,000.00 | ||||