| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| 100,000-barrel cut-and-cover JP-8 storage tank (steel with concrete outer wall and rolling cover) | 1 | each | $10,000,000.00 | $10,000,000.00 | Construction |
| Pump House (reinforced concrete construction with low slope concrete roof and built-up roofing) | 1 | each | $2,500,000.00 | $2,500,000.00 | Construction |
| 600-gpm issue vertical turbine pumps | 4 | each | $75,000.00 | $300,000.00 | Construction |
| 50-gpm water draw off vertical turbine pump | 1 | each | $30,000.00 | $30,000.00 | Construction |
| High-level valve for storage tank | 1 | each | $15,000.00 | $15,000.00 | Construction |
| Independent level alarms for storage tank | 1 | set | $10,000.00 | $10,000.00 | Construction |
| Automatic Tank Gauging (ATG) system hardware for new tank | 1 | set | $50,000.00 | $50,000.00 | Construction |
| Piping, valves, vaults, and appurtenances connecting to existing filter separator building | 1 | lot | $3,000,000.00 | $3,000,000.00 | Construction |
| Control system integration for new tank with existing filter building PLC and HMI | 1 | lot | $750,000.00 | $750,000.00 | Construction |
| Automatic Tank Gauge (ATG) reporting module capable of reporting inputs from all Eastside Fuel Facility tanks | 1 | each | $150,000.00 | $150,000.00 | Construction |
| Product saver tank for new bulk storage tank | 1 | each | $500,000.00 | $500,000.00 | Construction |
| Product recovery pump | 1 | each | $40,000.00 | $40,000.00 | Construction |
| Site adaptation and general construction services (excavation, foundations, electrical, HVAC, fire suppression, etc.) | 1 | lot | $7,500,000.00 | $7,500,000.00 | Construction |
| Estimated Bid Value | $25,000,000.00 | ||||
Sign up free to see the agency name and the original bid posting link. Pro adds the 2 documents, contracting-officer contacts and AI response outlines.