| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Major upgrade to campus medium voltage distribution system (overall project management and execution) | 1 | lot | $4,000,000.00 | $4,000,000.00 | Construction |
| Modifications to utility provider's outdoor substation | 1 | lot | $1,500,000.00 | $1,500,000.00 | Construction |
| Addition of campus walk-in service switchgear (including procurement and installation) | 1 | lot | $2,500,000.00 | $2,500,000.00 | Construction |
| Establishment of a sixth campus distribution loop (including trenching, conduit, cabling, and connections) | 1 | lot | $3,000,000.00 | $3,000,000.00 | Construction |
| Connection to a new cogeneration plant (electrical integration work) | 1 | lot | $1,000,000.00 | $1,000,000.00 | Construction |
| Demolition of an overhead distribution circuit (including removal of poles, wires, and associated equipment) | 1 | lot | $500,000.00 | $500,000.00 | Construction |
| Estimated Bid Value | $12,500,000.00 | ||||