GSU - RFQ Replace Terminal Units, Clarkston Building CH, Ground, 1st, and 2nd Floors

Estimated Value: $350,000
Open 20 days left GeorgiaInformation Technologyrfq
Oct 13, 2026
Nov 12, 2026 2:00 PM
Information Technology
rfq
236220
AI Summary
This bid is for the replacement of dual duct terminal units, associated temperature sensors, and pneumatic controls with electronic controls in the Clarkston Building CH, Ground, 1st, and 2nd floors at Georgia State University, including necessary ductwork demolition and replacement, power extension, and Building Management System updates.
Line Items
ItemQtyUnitEst. Unit PriceEst. TotalCategory
Replacement of dual duct terminal units (Ground Floor, 1st Floor, 2nd Floor, CH Building) 1 lot $150,000.00 $150,000.00 Construction
Replacement of temperature sensors associated with new terminal units 1 lot $20,000.00 $20,000.00 Construction
Demolition and replacement of ductwork connected to terminal units and duct mains (as needed) 1 lot $80,000.00 $80,000.00 Construction
Replacement of remaining pneumatic controls with electronic controls 1 lot $50,000.00 $50,000.00 Construction
Extension of existing 120V power to new 24V power for controlling new terminal units 1 lot $25,000.00 $25,000.00 Construction
Updates to Building Management System (BMS) controls, including sequence of operations and schematics 1 lot $25,000.00 $25,000.00 IT Services
Estimated Bid Value$350,000.00

Want the full details?

Sign up free to see the agency name and the original bid posting link, plus contracting-officer contacts and AI response outlines. Every feature is free through December 31, 2026.

Sign Up Free → Already have an account? Log in

Browse More Bids

Bids in GeorgiaInformation Technology BidsRFQ BidsClosing Soon All Bids