| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| CLEARING AND GRUBBING (Remove all trees, stumps, and vegetation from the track surface and dispose) | 317197 | SQFT | $0.50 | $158,598.50 | Construction |
| Infield Clearing, Grading, Drainage, SWPP Integration, and Grass Covering/Seeding (Remove all trees, vegetation from infield, Grade Infield for proper drainage in relation to track. Integrate SWPP in coordination with infield and track and log substantial events for SWPP. Add appropriate grass covering/ seeding for infield) | 1 | LS | $150,000.00 | $150,000.00 | Construction |
| CONSTRUCTION SURVEY AND STAKING (Ensure proper track surface elevations, grades and slopes, layout track southeast corner radius) | 1 | LS | $25,000.00 | $25,000.00 | Professional Services |
| SOIL EROSION AND SEDIMENT CONTROL (Install silt fence and protect culverts. CZM permit) | 1 | LS | $30,000.00 | $30,000.00 | Construction |
| RIPRAP OR APPROVE COMPARABLE (Install 6"-8" rip rap as subbase material for extension of southeast corner of track. Place material stripped from track surface to depth of 8") | 1 | LS | $100,000.00 | $100,000.00 | Construction |
| Estimated Bid Value | $1,000,000.00 | ||||
Sign up free to see the agency name and the original bid posting link. Pro adds contracting-officer contacts and AI response outlines.
Sign Up Free → Already have an account? Log in