| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Removal of select components of existing 30" diameter CMP stormwater drainage system | 1 | lot | $15,000.00 | $15,000.00 | Construction |
| Installation of 30" diameter RCP stormwater drainage system | 825 | LF | $150.00 | $123,750.00 | Construction |
| Installation of drop inlet | 1 | each | $5,000.00 | $5,000.00 | Construction |
| Installation of junction boxes | 5 | each | $3,500.00 | $17,500.00 | Construction |
| Removal and replacement of asphalt cart path | 1 | lot | $80,000.00 | $80,000.00 | Construction |
| Trench patching | 1 | lot | $50,000.00 | $50,000.00 | Construction |
| Existing structure modification | 1 | lot | $20,000.00 | $20,000.00 | Construction |
| Restriping of crosswalks | 1 | lot | $8,750.00 | $8,750.00 | Construction |
| Estimated Bid Value | $320,000.00 | ||||
Sign up free to see the agency name and the original bid posting link, plus contracting-officer contacts and AI response outlines. Every feature is free through December 31, 2026.
Sign Up Free → Already have an account? Log in