REQUEST FOR INFORMATION/SOURCES SOUGHT

Estimated Value: $75,000,000
Open New 17 days left New MexicoConstructionrfi
Oct 19, 2026
Nov 5, 2026 8:00 PM
Construction
rfi
236220
Small Business
AI Summary
The Department of the Army is seeking information on qualified contractors capable of designing and building a 67,833 SF, two-story facility at Kirtland Air Force Base, New Mexico. This facility will house controlled office space, secure communications, and a 200-seat auditorium for military, civilian, and contractor personnel. The project is estimated to cost between $50 million and $100 million, and the government is assessing potential set-aside decisions based on industry responses.
Line Items
ItemQtyUnitEst. Unit PriceEst. TotalCategory
Design-Bid-Build Construction of 67,833 SF Space Rapids Capabilities Office 1 project $75,000,000.00 $75,000,000.00 Construction
Controlled office space construction 67833 SF $500.00 $33,916,500.00 Construction
Parking facilities construction 1 lot $2,000,000.00 $2,000,000.00 Construction
Heating and cooling infrastructure 1 system $3,000,000.00 $3,000,000.00 Facilities
Power infrastructure 1 system $2,500,000.00 $2,500,000.00 Facilities
Water infrastructure 1 system $1,000,000.00 $1,000,000.00 Facilities
Sanitation infrastructure 1 system $1,000,000.00 $1,000,000.00 Facilities
Communications infrastructure 1 system $4,000,000.00 $4,000,000.00 Telecommunications
Reinforced foundations construction 1 project $5,000,000.00 $5,000,000.00 Construction
Two-story steel structure construction 1 project $8,000,000.00 $8,000,000.00 Construction
Metal stud framing with insulated metal panels 1 project $3,000,000.00 $3,000,000.00 Construction
Metal stud framing with precast concrete panels 1 project $3,000,000.00 $3,000,000.00 Construction
Low-slope single-ply membrane roof system 1 project $1,500,000.00 $1,500,000.00 Construction
Over-excavation and special foundations (due to soil conditions) 1 project $4,000,000.00 $4,000,000.00 Construction
Physical security measures 1 system $2,000,000.00 $2,000,000.00 Security
Electronic security measures 1 system $2,500,000.00 $2,500,000.00 Security
Compartmented workspaces for 10-15 teams 1 project $1,500,000.00 $1,500,000.00 Construction
200-seat controlled space auditorium construction 1 each $5,000,000.00 $5,000,000.00 Construction
Site preparation 1 project $1,500,000.00 $1,500,000.00 Construction
Seismic provisions 1 project $1,000,000.00 $1,000,000.00 Construction
Communications support 1 project $1,000,000.00 $1,000,000.00 Telecommunications
Secure communications trench 1 project $750,000.00 $750,000.00 Construction
Plumbing systems 1 system $1,000,000.00 $1,000,000.00 Facilities
Electrical systems 1 system $2,000,000.00 $2,000,000.00 Facilities
Gas systems 1 system $500,000.00 $500,000.00 Facilities
Fire protection systems 1 system $1,500,000.00 $1,500,000.00 Security
Landscaping 1 project $750,000.00 $750,000.00 Facilities
Storm drainage 1 system $1,000,000.00 $1,000,000.00 Facilities
Entry and access control systems 1 system $1,500,000.00 $1,500,000.00 Security
Estimated Bid Value$75,000,000.00

Want the full details?

Sign up free to see the agency name and the original bid posting link. Pro adds the 4 documents, contracting-officer contacts and AI response outlines.

+1 more
Sign Up Free → Already have an account? Log in

Browse More Bids

Bids in New MexicoConstruction BidsRFI BidsClosing Soon All Bids