| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Slope, Reference, and Clearing and Grubbing Control (Schedule A) | 1.051 | MILE | $15,000.00 | $15,765.00 | Construction |
| Removal of Pipe Culvert | 5 | EACH | $1,500.00 | $7,500.00 | Construction |
| Roadway Excavation | 1500 | CU YD | $50.00 | $75,000.00 | Construction |
| Roadway Aggregate, Method 2 (Schedule A) | 2500 | CU YD | $70.00 | $175,000.00 | Construction |
| Ditch Reconditioning (Schedule A) | 3280 | LN FT | $15.00 | $49,200.00 | Construction |
| Asphalt Concrete Pavement, Type 1 (Schedule A) | 2500 | TON | $150.00 | $375,000.00 | Construction |
| Concrete, Headwall for 24-Inch Pipe Culvert (L-Shaped) | 3 | EACH | $2,500.00 | $7,500.00 | Construction |
| Concrete, Headwall for 30-Inch Pipe Culvert | 1 | EACH | $3,000.00 | $3,000.00 | Construction |
| Concrete, Headwall for 66-Inch Pipe Culvert (Includes Wingwalls) | 1 | EACH | $8,000.00 | $8,000.00 | Construction |
| 24-Inch Pipe Culvert | 255 | LN FT | $100.00 | $25,500.00 | Construction |
| 30-Inch Pipe Culvert | 45 | LN FT | $120.00 | $5,400.00 | Construction |
| Lining 66-Inch Pipe Culvert (HDPE Slipline) | 110 | LN FT | $300.00 | $33,000.00 | Construction |
| Lining 72-Inch Pipe Culvert (HDPE Slipline) | 190 | LN FT | $350.00 | $66,500.00 | Construction |
| Pavement Markings, Type B, Solid (Schedule A) | 46000 | LN FT | $0.50 | $23,000.00 | Construction |
| Slope, Reference, and Clearing and Grubbing Control (Option X) | 0.38 | MILE | $15,000.00 | $5,700.00 | Construction |
| Embankment Construction | 200 | CU YD | $40.00 | $8,000.00 | Construction |
| Roadway Aggregate, Method 2 (Option X) | 700 | CU YD | $70.00 | $49,000.00 | Construction |
| Asphalt Concrete Pavement, Type 1 (Option X) | 650 | TON | $150.00 | $97,500.00 | Construction |
| Reinforced Shotcrete | 180 | SQ YD | $100.00 | $18,000.00 | Construction |
| Cleaning Culvert in Place | 7 | EA | $500.00 | $3,500.00 | Construction |
| Pavement Markings, Type B, Solid (Option X) | 8500 | LN FT | $0.50 | $4,250.00 | Construction |
| Conduit, 6-Inch, HDPE (Schedule 40) | 2215 | LN FT | $20.00 | $44,300.00 | Construction |
| Utility Box, Pullbox | 6 | EA | $750.00 | $4,500.00 | Construction |
| Utility Trench | 2215 | LN FT | $10.00 | $22,150.00 | Construction |
| Roadway profile raising at US 50 intersection | 1 | LS | $150,000.00 | $150,000.00 | Construction |
| Relocation of traffic counters | 1 | LS | $10,000.00 | $10,000.00 | Construction |
| Formalize parking area with ADA stalls | 1 | LS | $50,000.00 | $50,000.00 | Construction |
| Signing and striping (Schedule A) | 1 | LS | $20,000.00 | $20,000.00 | Construction |
| Rockfall mitigation | 1 | LS | $200,000.00 | $200,000.00 | Construction |
| Drainage improvements (Schedule A - general) | 1 | LS | $100,000.00 | $100,000.00 | Construction |
| Drainage improvements (Option X - general) | 1 | LS | $50,000.00 | $50,000.00 | Construction |
| Signing and striping (Option X) | 1 | LS | $10,000.00 | $10,000.00 | Construction |
| Installation of 6” electrical conduit for purposes of future automatic gate installation (Option X - general) | 1 | LS | $25,000.00 | $25,000.00 | Construction |
| Estimated Bid Value | $3,500,000.00 | ||||