IS4 – Phase 2 (594 31 63 01)

Estimated Value: $5,166,000
Open 25 days left WashingtonConstructionsolicitation
Oct 20, 2026
Nov 17, 2026 2:00 PM
Construction
solicitation
236220
AI Summary
The City of Stanwood is seeking bids for the IS4 – Phase 2 project, which involves constructing a storm sewer lift station. This includes a concrete vault with submersible pumps, a force main, electrical equipment, and a storm conveyance piping system with a jellyfish filter treatment. Bidders must submit sealed bids with a bid bond or certified check, and all work must be completed within 120 working days.
Line Items
ItemQtyUnitEst. Unit PriceEst. TotalCategory
Storm Sewer Lift Station (overall construction) 1 lot $2,000,000.00 $2,000,000.00 Construction
Concrete cast-in-place underground vault 1 each $500,000.00 $500,000.00 Construction
Flygt submersible pumps (185 hp) 3 each $75,000.00 $225,000.00 Construction
24-inch diameter restrained joint DI force main 1 lot $200,000.00 $200,000.00 Construction
24-inch diameter fusion welded HDPE pipe 1 lot $150,000.00 $150,000.00 Construction
Sleeving 24-inch force main through existing 36-inch CMP drainage pipe 1 lot $100,000.00 $100,000.00 Construction
Electrical component FRP enclosure 1 each $50,000.00 $50,000.00 Construction
VFD starter panels 1 lot $100,000.00 $100,000.00 Construction
Supply panels 1 lot $50,000.00 $50,000.00 Construction
Disconnect for portable city-owned generator 1 each $10,000.00 $10,000.00 Construction
Supply power vaults for power service 1 lot $30,000.00 $30,000.00 Construction
Large diameter SD pipe for storm conveyance 1 lot $250,000.00 $250,000.00 Construction
Catch basins 1 lot $75,000.00 $75,000.00 Construction
Jellyfish filter treatment system 1 each $150,000.00 $150,000.00 Construction
Flow splitter upstream of treatment system 1 each $50,000.00 $50,000.00 Construction
Partial removal of 72-inch corrugated metal storm pipe 1 lot $100,000.00 $100,000.00 Construction
Dewatering services 1 lot $200,000.00 $200,000.00 Construction
Shoring services 1 lot $200,000.00 $200,000.00 Construction
Coordination and relocation of SnoPUD power poles 1 lot $100,000.00 $100,000.00 Professional Services
General site work, earthwork, and miscellaneous construction 1 lot $421,000.00 $421,000.00 Construction
Estimated Bid Value$5,166,000.00

Want the full details?

Sign up free to see the agency name and the original bid posting link, plus the 2 documents, contracting-officer contacts and AI response outlines. Every feature is free through December 31, 2026.

📎 Advertisement.pdf View
📎 STANWOOD_IS-4_PHASE_2_-_COMBINED_SET__R_.pdf View
Sign Up Free → Already have an account? Log in

Browse More Bids

Bids in WashingtonConstruction BidsSOLICITATION BidsClosing Soon All Bids