| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| F-35 Composite Repair and Training Facility (Design and Construction) | 1 | lot | $157,886,000.00 | $157,886,000.00 | Construction |
| F-35 Maintenance Facility (Design and Construction) | 1 | lot | $213,716,000.00 | $213,716,000.00 | Construction |
| Medium Bay Industrial Facility (Composite Repair Area) | 1 | each | — | — | Construction |
| Covered Loading Dock | 1 | each | — | — | Construction |
| Clean Rooms (Repair Area) | 1 | lot | — | — | Construction |
| Cryogenic Tanks | 1 | lot | — | — | Facilities |
| Walk-in Freezer | 1 | each | — | — | Facilities |
| Overhead Cranes | 1 | lot | — | — | Facilities |
| Offices (Repair Area) | 1 | lot | — | — | Construction |
| Break Areas (Repair Area) | 1 | lot | — | — | Construction |
| Restrooms (Repair Area) | 1 | lot | — | — | Construction |
| Conference Rooms (Repair Area) | 1 | lot | — | — | Construction |
| Medium Bay F-35 Training Facility | 1 | each | — | — | Construction |
| Clean Rooms (Training Area) | 1 | lot | — | — | Construction |
| Sanding Areas | 1 | lot | — | — | Construction |
| Autoclave Areas | 1 | lot | — | — | Construction |
| Virtual Spray Booth Rooms | 1 | lot | — | — | Facilities |
| Spray Paint Booths | 1 | lot | — | — | Facilities |
| Soldering Labs | 1 | lot | — | — | Facilities |
| Classrooms | 1 | lot | — | — | Construction |
| Testing Center | 1 | each | — | — | Construction |
| Administration Area | 1 | each | — | — | Construction |
| Conference Rooms (Training Area) | 1 | lot | — | — | Construction |
| Instructor's Offices | 1 | lot | — | — | Construction |
| Common Area (Training Area) | 1 | each | — | — | Construction |
| Restrooms (Training Area) | 1 | lot | — | — | Construction |
| Break Room (Training Area) | 1 | each | — | — | Construction |
| Reinforced Concrete Footings | 1 | lot | — | — | Construction |
| Foundation | 1 | lot | — | — | Construction |
| Floor Slab | 1 | lot | — | — | Construction |
| Structural Steel Frame | 1 | lot | — | — | Construction |
| Insulated Masonry Walls | 1 | lot | — | — | Construction |
| Insulated Roof | 1 | lot | — | — | Construction |
| Sensitive Access Program Spaces (ICD 705 Compliance) | 1 | lot | — | — | Security |
| SAPF Level Security Area (ICD 705 Protection) | 1 | lot | — | — | Security |
| Heating, Ventilation, Air Conditioning (HVAC) | 1 | lot | — | — | Facilities |
| Industrial Ventilation | 1 | lot | — | — | Facilities |
| Compressed Air System | 1 | lot | — | — | Facilities |
| Emergency Back-up Power Generators | 1 | lot | — | — | Facilities |
| Intrusion Detection System | 1 | lot | — | — | Security |
| Fire Detection/Suppression System | 1 | lot | — | — | Security |
| Utilities (Water, Sewer, Electrical, etc.) | 1 | lot | — | — | Facilities |
| Site Improvements (Paving, Landscaping, etc.) | 1 | lot | — | — | Construction |
| Communication Support Infrastructure | 1 | lot | — | — | Telecommunications |
| Anechoic Chambers | 1 | lot | — | — | Facilities |
| Security Office (Associated with Anechoic Chambers) | 1 | each | — | — | Construction |
| Estimated Bid Value | $371,602,000.00 | ||||