| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Inspection, diagnostics, and renewal of low-voltage electrical systems | 1 | lot | $500,000.00 | $500,000.00 | Facilities |
| Inspection, diagnostics, and renewal of medium-voltage electrical systems | 1 | lot | $750,000.00 | $750,000.00 | Facilities |
| Modernization or replacement of transformers | 1 | lot | $200,000.00 | $200,000.00 | Construction |
| Modernization or replacement of switchgear | 1 | lot | $300,000.00 | $300,000.00 | Construction |
| Modernization or replacement of panelboards | 1 | lot | $100,000.00 | $100,000.00 | Construction |
| Modernization or replacement of protective devices | 1 | lot | $75,000.00 | $75,000.00 | Construction |
| Modernization or replacement of motor control centers | 1 | lot | $150,000.00 | $150,000.00 | Construction |
| Modernization or replacement of emergency generator assemblies with transfer switches | 1 | lot | $400,000.00 | $400,000.00 | Construction |
| Modernization or replacement of fire alarm networks | 1 | lot | $250,000.00 | $250,000.00 | Security |
| Modernization or replacement of power conditioning equipment | 1 | lot | $100,000.00 | $100,000.00 | Facilities |
| Modernization or replacement of surge and lightning protection | 1 | lot | $80,000.00 | $80,000.00 | Facilities |
| Modernization or replacement of interior and specialty lighting systems | 1 | lot | $180,000.00 | $180,000.00 | Facilities |
| Modernization or replacement of conductors, cables, and associated terminations | 1 | lot | $220,000.00 | $220,000.00 | Construction |
| Repair and integration of Direct Digital Controls (DDC) for HVAC | 1 | lot | $150,000.00 | $150,000.00 | Facilities |
| Repair and integration of vertical transportation equipment control/lighting systems | 1 | lot | $120,000.00 | $120,000.00 | Facilities |
| Repair and integration of other specialized building automation systems | 1 | lot | $100,000.00 | $100,000.00 | Facilities |
| Work on overhead and underground distribution systems | 1 | lot | $350,000.00 | $350,000.00 | Construction |
| Work on service feeders | 1 | lot | $100,000.00 | $100,000.00 | Construction |
| Work on grounding grids | 1 | lot | $50,000.00 | $50,000.00 | Construction |
| Work on duct banks | 1 | lot | $70,000.00 | $70,000.00 | Construction |
| Work on conduit networks | 1 | lot | $60,000.00 | $60,000.00 | Construction |
| Work on manholes | 1 | lot | $40,000.00 | $40,000.00 | Construction |
| Provision of temporary power during outages | 1 | lot | $100,000.00 | $100,000.00 | Facilities |
| Coordination of system cutovers | 1 | lot | $75,000.00 | $75,000.00 | Professional Services |
| Functional testing, commissioning, and acceptance activities | 1 | lot | $150,000.00 | $150,000.00 | Professional Services |
| Energy efficiency-driven upgrades | 1 | lot | $200,000.00 | $200,000.00 | Energy |
| Emergency repair services for electrical systems | 1 | lot | $250,000.00 | $250,000.00 | Facilities |
| Estimated Bid Value | $5,000,000.00 | ||||