| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Coffer dam installation at inlet pipe location | 1 | lot | $50,000.00 | $50,000.00 | Construction |
| Float well pipe (3-inch cast iron) cleaning | 1 | lot | $20,000.00 | $20,000.00 | Construction |
| Installation of internal liner for float well pipe | 1 | lot | $100,000.00 | $100,000.00 | Construction |
| Pre and Post liner installation CCTV inspections | 2 | each | $10,000.00 | $20,000.00 | Construction |
| Repairs to the slash-zone pipe segment | 1 | lot | $75,000.00 | $75,000.00 | Construction |
| Protection and concrete encasement of the external float well pipe | 1 | lot | $100,000.00 | $100,000.00 | Construction |
| Staff Gauges: Pressure treated posts with attached enamel coated metal measuring strip | 1 | lot | $60,000.00 | $60,000.00 | Construction |
| Estimated Bid Value | $425,000.00 | ||||