| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Non-Organizational Vehicle Parking Garage (Progressive Design-Build) | 1 | project | $207,600,000.00 | $207,600,000.00 | Construction |
| Water Wells and Storage Tank at Helemano Military Range (Design-Build to Budget) | 1 | project | $104,000,000.00 | $104,000,000.00 | Construction |
| Clearwell & Booster Pump at Fort Shafter (Design-Build to Budget) | 1 | project | $93,000,000.00 | $93,000,000.00 | Construction |
| Elevated Water Storage Tank at East Range, Schofield Barracks (Design-Build to Budget) | 1 | project | $41,000,000.00 | $41,000,000.00 | Construction |
| Elevated Water Storage Tank at Kolekole, Schofield Barracks (Design-Build to Budget) | 1 | project | $41,000,000.00 | $41,000,000.00 | Construction |
| Potable Water Storage Tank (North Tank) at Aliamanu Military Reservation (Design-Build to Budget) | 1 | project | $20,680,000.00 | $20,680,000.00 | Construction |
| Repair Above-Ground 8" Cast Iron Water Line to AMR 181 Tank (Design-Build to Budget) | 1 | project | $1,804,000.00 | $1,804,000.00 | Construction |
| Tank 181 at Aliamanu Military Reservation (Design-Build to Budget) | 1 | project | $1,000,000.00 | $1,000,000.00 | Construction |
| PACAF Combined Operations Center at JBPHH (Progressive Design-Build) | 1 | project | $248,000,000.00 | $248,000,000.00 | Construction |
| Estimated Bid Value | $758,184,000.00 | ||||
Sign up free to see the agency name and the original bid posting link, plus contracting-officer contacts and AI response outlines. Every feature is free through December 31, 2026.
Sign Up Free → Already have an account? Log in