| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Equipment Maintenance, Repair, and Corrosion Prevention and Control Services for Civil Engineering Support Equipment (CESE) | 1 | lot | $4,250,000.00 | $4,250,000.00 | Facilities |
| Equipment Maintenance, Repair, and Corrosion Prevention and Control Services for Civil Engineer End Items (CEEI) | 1 | lot | $4,250,000.00 | $4,250,000.00 | Facilities |
| Equipment Maintenance, Repair, and Corrosion Prevention and Control Services for Material Handling Equipment (MHE) | 1 | lot | $2,500,000.00 | $2,500,000.00 | Facilities |
| Equipment Maintenance, Repair, and Corrosion Prevention and Control Services for Weight Handling Equipment (WHE) | 1 | lot | $2,500,000.00 | $2,500,000.00 | Facilities |
| Equipment Maintenance, Repair, and Corrosion Prevention and Control Services for Support Vehicles | 1 | lot | $1,500,000.00 | $1,500,000.00 | Facilities |
| Equipment Maintenance, Repair, and Corrosion Prevention and Control Services for Containerized Base Camp Facility Items | 1 | lot | $2,000,000.00 | $2,000,000.00 | Facilities |
| Estimated Bid Value | $17,000,000.00 | ||||
Sign up free to see the agency name and the original bid posting link, plus the 4 documents, contracting-officer contacts and AI response outlines. Every feature is free through December 31, 2026.