| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Vegetation Control Services (Railroad Right-of-Way) | 1 | lot | $1,200,000.00 | $1,200,000.00 | Facilities |
| Railroad Infrastructure Inspection Services | 1 | lot | $250,000.00 | $250,000.00 | Professional Services |
| Personnel (Supervision, Laborers, Equipment Operators) | 1 | lot | $1.00 | $1.00 | Professional Services |
| Equipment (Vegetation Control Machinery, Inspection Tools) | 1 | lot | $1.00 | $1.00 | Other |
| Supplies (Herbicides, Safety Gear, Fuel) | 1 | lot | $1.00 | $1.00 | Other |
| Transportation (Personnel and Equipment to Sites) | 1 | lot | $1.00 | $1.00 | Transportation |
| Facilities (Temporary staging/storage if required) | 1 | lot | $1.00 | $1.00 | Facilities |
| Tools (Hand tools, specialized equipment) | 1 | lot | $1.00 | $1.00 | Other |
| Materials (e.g., erosion control materials if needed) | 1 | lot | $1.00 | $1.00 | Other |
| Estimated Bid Value | $1,500,000.00 | ||||
Sign up free to see the agency name and the original bid posting link, plus the 4 documents, contracting-officer contacts and AI response outlines. Every feature is free through December 31, 2026.