| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Micro surfacing (roadway) | 1 | lot | $500,000.00 | $500,000.00 | Construction |
| Thin lift asphalt overlay (roadway) | 1 | lot | $600,000.00 | $600,000.00 | Construction |
| Crack cleaning and sealing (asphalt pavement) | 1 | lot | $150,000.00 | $150,000.00 | Construction |
| Asphalt concrete pavement patching | 1 | lot | $250,000.00 | $250,000.00 | Construction |
| Milling and overlay (asphalt pavement) | 1 | lot | $700,000.00 | $700,000.00 | Construction |
| Concrete repair (roadway/bridge) | 1 | lot | $300,000.00 | $300,000.00 | Construction |
| Drainage repairs | 1 | lot | $200,000.00 | $200,000.00 | Construction |
| Speed bump replacement | 1 | lot | $50,000.00 | $50,000.00 | Construction |
| Concrete paver installation | 1 | lot | $100,000.00 | $100,000.00 | Construction |
| Pavement markings | 1 | lot | $150,000.00 | $150,000.00 | Construction |
| Minor bridge repairs | 1 | lot | $350,000.00 | $350,000.00 | Construction |
| Miscellaneous construction work | 1 | lot | $150,000.00 | $150,000.00 | Construction |
| Estimated Bid Value | $3,500,000.00 | ||||
Sign up free to see the agency name and the original bid posting link, plus the 1 document, contracting-officer contacts and AI response outlines. Every feature is free through December 31, 2026.