| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Installation of sampling gauge hatch on manway | 1 | each | $2,500.00 | $2,500.00 | Construction |
| Installation of clock type mechanical gauge on manway | 1 | each | $2,000.00 | $2,000.00 | Construction |
| Recoating exterior of fuel storage tank | 1 | lot | $30,000.00 | $30,000.00 | Facilities |
| Replacement of collision barriers | 1 | lot | $10,000.00 | $10,000.00 | Construction |
| Addition of catwalk across entirety of tank | 1 | each | $15,000.00 | $15,000.00 | Construction |
| Replacement of audible and visual alarms | 1 | lot | $5,000.00 | $5,000.00 | Facilities |
| Repair of remote containment basin drainage issue | 1 | lot | $7,500.00 | $7,500.00 | Construction |
| Replacement of asphalt on NE side of fueling facility | 1 | lot | $20,000.00 | $20,000.00 | Construction |
| Repair of refueler parking concrete | 1 | lot | $15,000.00 | $15,000.00 | Construction |
| Replacement of dispenser fuel monitor with non-coalescing filter and installation of water draw off system with hand pump | 1 | each | $8,000.00 | $8,000.00 | Facilities |
| Replacement of asphalt near loading/unloading facility with concrete path | 1 | lot | $25,000.00 | $25,000.00 | Construction |
| Replacement of POL building (same size and location) | 1 | each | $100,000.00 | $100,000.00 | Construction |
| Supplying, installation, and testing of ATG system on AVGAS Fuel Storage Tank | 1 | each | $40,000.00 | $40,000.00 | Facilities |
| Relocation of generator from compartmentalized area | 1 | each | $15,000.00 | $15,000.00 | Construction |
| Estimated Bid Value | $315,000.00 | ||||