| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Roof replacement for three buildings (Chino Yard Office, Supervisor's Office, Chino Shop) | 1 | lot | $45,000.00 | $45,000.00 | Construction |
| Drywall and insulation replacement (storm damaged areas) | 1 | lot | $15,000.00 | $15,000.00 | Construction |
| Door replacement (storm damaged) | 1 | each | $1,500.00 | $1,500.00 | Construction |
| Ceiling and insulation replacement (storm damaged areas) | 1 | lot | $10,000.00 | $10,000.00 | Construction |
| Installation of gutters and downspouts (new for three buildings) | 1 | lot | $7,500.00 | $7,500.00 | Construction |
| Replace portion of the side of the Chino Yard Office | 1 | lot | $8,000.00 | $8,000.00 | Construction |
| Maintenance to metal roofs on Supervisor's Office and Chino Shop | 1 | lot | $6,000.00 | $6,000.00 | Facilities |
| Repair window frames on upper windows (Supervisor's Office) | 1 | lot | $3,000.00 | $3,000.00 | Construction |
| Caulk ALL windows (Supervisor's Office) | 1 | lot | $2,500.00 | $2,500.00 | Facilities |
| Install Z bar at the roof line (Supervisor's Office) | 1 | each | $1,000.00 | $1,000.00 | Construction |
| Gutters and downspouts installation (Chino Shop) | 1 | lot | $3,500.00 | $3,500.00 | Construction |
| Exterior painting on the Yard Office (Optional) | 1 | lot | $12,000.00 | $12,000.00 | Facilities |
| Replace weather stripping on two garage doors (Optional) | 2 | each | $300.00 | $600.00 | Facilities |
| Replace door sweep on a manway (Optional) | 1 | each | $150.00 | $150.00 | Facilities |
| Drywall and insulation replacement due to mold (Supervisor's Office - Optional) | 1 | lot | $15,000.00 | $15,000.00 | Construction |
| Estimated Bid Value | $155,000.00 | ||||
Sign up free to see the agency name and the original bid posting link, plus the 9 documents, contracting-officer contacts and AI response outlines. Every feature is free through December 31, 2026.